Skip to end of metadata
Go to start of metadata

Purpose

The purpose of this page is to clarify the understanding of the system logic and requirements in relation to the settlement of asset under construction through transaction codes AIAB and AIBU.

Overview

The following paragraphs and screen shots will describe an EXAMPLE in steps of a settlement of asset under construction using transaction codes AIAB and AIBU and provide an explanation of the functionality of the main fields and buttons.

Preparing scenario

Creating the Assets:

1.1) Create an asset under construction using asset class that refers to AUC. and post two acquisitions to this asset  with different posting date, please refer to the following  link how to post acquisitions: Asset acquistion.

1.2) After creating and posting to this asset, AW01N should appears like the following picture:

1.3)  Create another asset with a non-asset under construction class without any posting.

Setting distribution rules through transaction code AIAB

2.1) To set distribution rules to an asset under construction go to Navigation:  SAP Easy Access -> SAP Menu -> Accounting -> Financial accounting -> Fixed Asset -> Posting -> Capitalize Asset u. Const. -> Distribute.

Alternatively: Transaction code AIAB.

2.2) Fill out Field Asset with your asset number already created and with postings (press F8)

2.3) Select the first of the two line items as per the picture above, then press button -Enter- or shift+f6 

2.4) Fill out Field settlement Receiver with the first asset created in the section 1.3 and fill out filed % percentage with 100. Them press button to check or Shift+f2. 

2.5) After that, return to line items screen pressing return button or F3. Select the second line item and press button --Enter- or shift+f6.

2.6) Fill out Field settlement Receiver with the second asset created in the section 1.3 and fill out filed % percentage with 50. Them press button to check or Shift+f2. 

2.7) After that, return to line items screen pressing return button or F3 and save. Now the distribution rules are created.

Settlement  AUC through transaction code AIBU

3.1) To settle an asset under construction go to Navigation:  SAP Easy Access -> SAP Menu -> Accounting -> Financial accounting -> Fixed Asset -> Posting -> Capitalize Asset u. Const. ->Settle.

Alternatively: Transaction code AIAB

3.2) Fill out Field Asset  with your asset under construction number already created  with postings, same that you used in section 2.2.Fill out Fields Document Date, Posting date and Asset Values (it cannot be a date prior to this asset capitalization date).  Press “Simulation” button    to simulate settlement document creation.

3.4) For means of check you can go to asset explorer and check the values posted to the asset under construction and the receivers assets.

Related Content

Related Documents

Basics of Asset Accounting - Asset Acquisition

Basics of Asset Accounting - Asset Retirement

Basics of Asset Accounting - Asset Transfer

Basics of Asset Accounting - Asset Transfer (Intercompany)

Cross system Depreciation Areas and Intercompany Asset transfer

Defining posting rules for depreciation

Settlement of an Asset under Construction

Related SAP Notes/KBAs

  • No labels

1 Comment

  1. Could you add a note and tell us the differences between  AIAB and AIBU

     

    regards

    Arvind Leo Pereira