Purpose

The purpose of this document is to clarify the steps that have to be done to upgrade to SAP ECTR or SAP ECTR S/4.

Overview

This matrix shall give you an overview about the steps:

Backend - transports / Add-ons Legacy ECTR 4.4 → SAP ECTR 5.2

Legacy ECTR 4.4 → SAP ECTR S/4 1.1

 
Legacy ECTR 4.7 5.2

DSCSAG PLM 4.4 <last version>.zip (min. 4.053.33)

1 (*)
1 (*)

DSCSAG PLM Enhancement 4.4 <last_version>.zip (min. 4.051.20)

2 (*) 2 (*)

++processAutomation 4.4 <last_version>.zip (optional)(3)  (*)
(3) (*)

Fulfill the requirements of the notes 2049249 (and optional 2050165).4

Fulfill the requirements of the note 2325172.
4
Delete Index "FNL" from table /DSCSAG/DOC_RED


SAP ECTR 520 AddOn incl. all available SPs

5
1 (use same SP as 4.7)
SAP S4ECTR 110 AddOn incl. all available SPs
5

PLM BUSINESS Add on incl. all available SPs 1

66

DSCSAG PLM LEG001 <last_version>.zip (same like for 5.1) 1

77

PLM LEG002 Add on incl. all available SPs  1

88

++processAutomation Add on incl. all available SPs (optional)

(9)(9)

++batchEngine Add on incl. all available SPs (optional)

(10)(10)
BC-Set /DSCSAG/ECTR_NX_CDESK (optional)(11)(11)
BC-Set /DSCSAG/ECTR4_NX_CDESK (optional)


Report /DSCSAG/DMU_TRANSFER (optional)(12)(12)

(*) if the customer has already installed ECTR or S4ECTR then don't do this step 1 and 2 any more!

(n) optional step - It depends if the mentioned software is installed already.

1 See Note 2105749 how to request these back-end transports or addons. 

If you like to upgrade from 4.6 to ECTR 5.2 or SAP ECTR S/4HANA 1.1 please ask your DSC consultant. 

Related Content

Related Documents

Related SAP Notes/KBAs

SAP Note 2105749: ECTR: Upgrade from "SAP PLM interface to NX" to "SAP Engineering Control Center interface to NX"